Appendix 3

 

Community hubs arrangements and vision summary

The Collaborate report sets out different types of Community Hubs that exist in East Sussex and across the country which can include the following arrangements:

 

The original engagement activity was seeking to develop a jointly shared ‘vision’ for Community Hubs within East Sussex. This vision is set out in a number of ways within the discussion report, through the design principles, ambitions, target audience and wellbeing factors, in summary:

 

Design principles (page 18)

Ambition (pages 19 – 21)

·         Core components, local flexibility

·         Community engagement

·         Co-location and partnership working

 

·         No-one left behind

·         Long-term relationships

·         Welcoming to all

·         Financially stable

·         Empowering

·         Build on what’s already there

·         Accessible

·         Seamless